To lay the paving, place the tiles in a « stepping stone » arrangement. It is important to estimate the number of stepping stones needed to complete the path, then arrange the tiles an equal distance apart.
To lay the paving, place the tiles in a « stepping stone » arrangement. It is important to estimate the number of stepping stones needed to complete the path, then arrange the tiles an equal distance apart.
For optimum stability, dig out to a depth of 5 to 6 cm and add a bed of fine gravel with a grain size of between 4 and 8 mm. Consolidate the substrate before laying the tiles. The tiles should remain below the level of the grass to avoid damaging the lawnmower when it passes.The laying can also be carried out on concrete rather than gravel.